Overview:
Project name: Yimei group village colliery distributed energy center
Project location: Sanmenxia city, Henan
Investor: Henan Sanmenxia Yimei group
Equipment selection: Two unit 1160kw hot water LiBr absorption chiller
Project area: 16000 M2
Main feature: Air conditioning for staff dormitory
Introduction:
Henan Sanmenxia Yimei group is super-huge enterprise, which has formed four industrial chain, including coal power, coal for aluminum, coal for chemical industrial, coal for construction material. Until now some progress have been made when using the coal and gas. The build up of the 4*500kw gas power plant made a big progress in gas drainage and plucking to the comprehensive utilization. After the 7 gas power plant been built in the first phase entirely, the exhaust heat can be used to supply heating and cooling. Coal and gas power plant of Yimei group is a kind of co-generation ( CCHP ) project.
Yimeigroup Gen village coal mine built the gas power plant with coal. In order to improve the energy utilization rate and solve the air-conditioning problem ofthe six single dormitory, Deepblue's absorption chilled have been adopted.
It was designed by Deepblue. Using 120/80oC hot water LiBr absorption chiller ( large temp difference), and fan coil units have been adopted at the terminal, without fresh air system.
Highlights:
Waste material recovery, comprehensive utilization of energy, acquisition of coal mine gas into gas power plant and the whole system design realized this co-generation project.